The Basalt Waste Water Treatment Plant project consisted of installation of dewatering equipment
including pumps, piping and centrifuge. Making improvements to an existing plant presented challenged
because the access to the actual plant was limited and several obstacles affected the ease of construction.
All piping had to be field fitted and equipment was man-handled.